at 13:59pm on may 31, 2024, the epc project of wuhan south domestic waste power plant rehabilitation and expansion project of the company ushered in an important moment, as the first bays of the boiler steel frame were successfully lifted into place. this breakthrough progress laid a solid foundation for the subsequent installation work, and also marked the official start of the boiler installation of the project.
it is reported that the construction scale of southern wuhan domestic waste power plant renovation and expansion project 6x875t/d grate furnace incineration line 2x55mw condensing turbine 2x60mw generator 1x15mw backpressure turbine 1x18mw generator 500t/d food waste incineration co-processing 300t/d sludge drying and treatment system and related auxiliary facilities, is currently the largest waste incineration plant in the country, with a daily treatment capacity of 1,000 tons. it is the project with the largest daily processing capacity of waste incineration under construction in china, and has been attracting much attention.
the successful lifting of the first bays of the boiler steel frame has undoubtedly injected a strong impetus to the smooth progress of the project. this is the result of the professional ability and efficient collaboration of the company's project team, and also highlights the company's technical strength and determination to continuously pursue progress in the field of waste treatment.
with the official opening of the boiler installation, the project will step into a new phase. in the future, the project will surely play a key role in solving the problem of local domestic garbage treatment and improving environmental quality, realizing garbage into treasure and contributing to the sustainable development of the city.